Florida Power & Light secures rights to automate gas pipeline pathway selection and nomination.

The filing

Florida Power & Light Company received a US grant on November 17, 2026 for a system that automates the selection and nomination of gas pipeline pathways to address the difficulty and uncertainty of choosing routes among numerous dynamic variables. The invention describes a computing system that receives a request for gas distribution, automatically gathers data from third-party entities, market sources, and environmental sources, and simulates multiple potential pathways to output a recommendation with associated financial costs and risk factors.

Figure

Fig. 016
Patent drawing from USPTO 12800115
Gas Pipeline Pathway Analysis, Control and Communication2026
FLORIDA POWER & LIGHTUSPTO 12800115

The claims

USPTO 12800115 / 3 independent claims of 20

  1. Claim 1

    1. A system for physical pipeline analysis and control of gaseous resource scheduling comprising: a server or computer-based computing system comprising a control circuit that cooperatively operates with a distributed communications network; and an application stored on a non-transitory storage medium and executable by the control circuit, wherein when executed, the application is configured to: receive a user input corresponding to a request for a gaseous resource to be distributed through a physical gas pipeline network to a destination location at a destination time, wherein the gas pipeline network comprises a network of physical pipes and connections, usage of which is controlled by third-party entities and costs associated with distribution of the gaseous resource vary according to a plurality of factors; automatically obtain, over the distributed communications network, data from a plurality of data sources, the plurality of data sources including data sources provided by the third-party entities, market sources, and environmental sources; automatically simulate a plurality of potential pathways of the gas pipeline network between a first gaseous resource provider to the destination location to meet the request; automatically output a pathway recommendation comprising at least a first recommended pathway of the gas pipeline network to meet the request and associated financial costs; receive a user selection of a selected recommended pathway from the pathway recommendation; automatically format a nomination for the selected recommended pathway including all formal requirements of each of one or more of the third-party entities each controlling a portion of the gas pipeline network establishing the selected recommended pathway; and automatically access, via the distributed communications network, and control a separate electronic submission system and electronically submit the nomination for the request for the gaseous resource to the electronic submission system for execution.

  2. Claim 10

    10. A method for physical pipeline analysis and control of gaseous resource scheduling comprising: receiving, by a server or computer-based computing system communicatively coupled via a distributed communications network and executing a scheduling application stored on a non-transitory storage medium, a user input corresponding to a request for a gaseous resource to be distributed through a gas pipeline network to a destination location at a destination time, wherein the gas pipeline network comprises a network of physical pipes and connections, usage of which is controlled by third-party entities and costs associated with distribution of the gaseous resource vary according to a plurality of factors; automatically obtaining, over the distributed communications network, data from a plurality of data sources, the plurality of data sources including data sources provided by the third-party entities, market sources, and environmental sources; automatically simulating a plurality of potential pathways of the gas pipeline network between a first gaseous resource provider to the destination location to meet the request; automatically outputting a pathway recommendation comprising at least a first recommended pathway of the gas pipeline network to meet the request and associated financial costs; receiving a user selection of a selected recommended pathway from the pathway recommendation; automatically formatting a nomination for the selected recommended pathway including all formal requirements of each of one or more of the third-party entities each controlling a portion of the gas pipeline network establishing the selected recommended pathway; and automatically accessing, via the distributed communications network, and controlling a separate electronic submission system and electronically submitting the nomination for the request for the gaseous resource to the electronic submission system for execution.

  3. Claim 19

    19. A system for scheduling gaseous resources over a physical gas pipeline network comprising: a control circuit; and an application stored on a non-transitory storage medium and executable by the control circuit, wherein when executed, the application is configured to: receive a user input corresponding to a request for a gaseous resource to be distributed through the physical gas pipeline network to a destination location at a destination time, wherein the gas pipeline network comprises a network of physical pipes and connections, usage of which is controlled by third-party entities and costs associated with distribution of the gaseous resource vary according to a plurality of factors; automatically obtain, over a distributed communications network, data from a plurality of data sources, the plurality of data sources including data sources provided by the third-party entities, market sources, and environmental sources; automatically simulate a plurality of potential pathways of the gas pipeline network between a first gaseous resource provider to the destination location to meet the request; automatically output a pathway recommendation comprising at least a first recommended pathway of the gas pipeline network to meet the request and associated financial costs; receive a user selection of a selected recommended pathway from the pathway recommendation; automatically format a nomination for the selected recommended pathway including all formal requirements of each of one or more of the third-party entities each controlling a portion of the gas pipeline network establishing the selected recommended pathway; and automatically access, via the distributed communications network, and control a separate electronic submission system and electronically submit the nomination for the request for the gaseous resource to the electronic submission system for execution.

The 17 dependent claims are in the record.

Examiner rulings

  • Notice of Allowance, : Claims 1-20 allowed; Claims 2-9 allowed

Expert view

Florida Power & Light Company received a US grant on November 17, 2026 for a system that automates the selection and nomination of gas pipeline pathways to address the difficulty and uncertainty of choosing routes among numerous dynamic variables. The invention describes a computing system that receives a request for gas distribution, automatically gathers data from third-party entities, market sources, and environmental sources, and simulates multiple potential pathways to output a recommendation with associated financial costs and risk factors. The system further formats and electronically submits the nomination for the selected pathway while incorporating real-time re-simulation and reconciliation of delivery quantities and costs.

Background

The applicant’s account of the prior art / USPTO 12800115

Gas is often transported to an intended consumer through one or more pipelines of one or more gas transmission pipeline networks. The use of the pipelines is typically based on the advance scheduling of a gas pipeline transfer through a determined pipeline pathway. The selection of a determined pipeline pathway from numerous pipeline pathway options for gas transfer is difficult, time intensive, and uncertain due to many dynamic variables. If the selected pipeline pathway has not been carefully considered among the many available pipeline pathway choices, a gas customer may overpay for a given gas transfer. And if the selected pipeline pathway cannot provide the desired gas volume when needed, a gas customer may be forced to obtain gas from another source in a real-time market at a higher rate.

Sources (1)

  • USPTO 12800115Gas Pipeline Pathway Analysis, Control and Communication

Get Energy & Climate every Monday.

© 2026 Fearn AI, Inc. All rights reserved.

Information from the public patent record, not legal advice.

Big Law patents. In plain sight.

The all-in-one patent firm for startups. Former Big Law patent experts and PhDs, on AI that runs on our own GPUs.

Social

Newsletter

Stay updated on the future of intellectual property.

Fearn Legal, LLC is a patent prosecution firm, licensed to file and prosecute patents across the USPTO. The information provided here is for general informational purposes only and does not constitute legal advice. Viewing this information or contacting us through this website does not create an attorney-client or patent agent-client relationship. For personalized legal advice, please reach out to us directly to set up a legal consult or consult directly with a qualified attorney.

Big Law patents. In plain sight.

Social

Newsletter

Stay updated on the future of intellectual property.

Fearn Legal, LLC is a patent prosecution firm, licensed to file and prosecute patents across the USPTO. The information provided here is for general informational purposes only and does not constitute legal advice. Viewing this information or contacting us through this website does not create an attorney-client or patent agent-client relationship. For personalized legal advice, please reach out to us directly to set up a legal consult or consult directly with a qualified attorney.

Big Law patents. In plain sight.

The all-in-one patent firm for startups. Former Big Law patent experts and PhDs, on AI that runs on our own GPUs.

Social

Newsletter

Stay updated on the future of intellectual property.

Fearn Legal, LLC is a patent prosecution firm, licensed to file and prosecute patents across the USPTO. The information provided here is for general informational purposes only and does not constitute legal advice. Viewing this information or contacting us through this website does not create an attorney-client or patent agent-client relationship. For personalized legal advice, please reach out to us directly to set up a legal consult or consult directly with a qualified attorney.